| Or just little pink house? |
Here is part 2 of the terrain project the building.- | I carved out brick work with a knife |
| On all sides |
| Windows and the front door |
| Close up of the door |
| The windows and door were pinned to the foam |
| Side ornamentation |
| Back windows |
| The Roof in progress front |
| Back |
| Completed Roof |
| The top is flat to allow figures to stand on it |
| Top down view |
These were from the other night- the building is primed but I don't have pictures yet.
Till next time
RGH
No comments:
Post a Comment